The move towards electric vehicles is part and parcel of many business’ net zero pledge. And it changes the way that a company thinks about their fleets. An organisation running a couple of electric vehicles has a straightforward consideration to make. However, if the business is operating a fleet of electric vans, cars, or commercial vehicles, charging requires more planning.
Installing a few EV chargers in a car park goes beyond choosing a suitable unit and plugging in to the nearest power supply. A commercial EV fleet charging system needs to work around the vehicles, the working day, and the sites’ capabilities.

Understanding How Your Fleet Operates

To begin planning for any EV charging installation, Maintenance Service Electrical would begin with the fleet itself.
How many vehicles will need charging? How far does each vehicle travel each day? At what point are they expected back on site? How long do they remain there? Is it important that the vehicles are fully charged every day?
It’s a lot of questions, but they matter. Charging requirements vary from business to business, and it’s important to understand them all.
The fleet of vans returning at 5pm to remain there overnight has far different requirements to a fleet that operates for 24 hour a day. Different rosters mean different charging needs, and understanding those patterns allows for charging infrastructure to be designed around usage as opposed to installing the maximum number of EV chargers possible.

Can Your Electrical Supply Handle the Demand?

Another key consideration for a commercial fleet is the existing infrastructure.
Charging myriad vehicles at once creates a significant demand upon the electrical supply. Before installation begins, the system needs to be professionally assessed to determine whether it is suitable for the proposed charging infrastructure.
That assessment will involve analysing the existing supply, distribution equipment, cabling, and the sites’ overall electrical demand.
This is one of the reasons commercial EV charging should be treated as an a project as opposed to a simple charger installation.

Choosing the Right Charging Solution

Does your fleet really need rapid charging?
If vehicles are parked at a depot overnight, standard AC charging provides more than enough time to replenish a battery before the following working day. Fleets that return for shorter periods may need faster charging.
Therefore, the right solution is dependent upon the way vehicles are used.
There is little to no value installing unnecessarily powerful equipment if vehicles spend more time parked than moving. Equally, a fleet that doesn’t stop moving requires a different approach.
The objective should be to provide sufficient charging capacity for the way the business operates.

Planning for a Growing Fleet

Of course, a business’ objectives stretch beyond their current operations.
Today, you might need charging facilities for five electric vans. However, what happens when that number becomes ten or fifteen?
Planning for expansion makes future upgrades easier. Cable routes, distribution equipment, and available electrical capacity can all be considered with projections for the future in mind.
Of course, that doesn’t mean installing fifteen chargers on the first day. It means making sure that the installation does allow for expansion. It considers what is needed for the later charging infrastructure.

The Charger Is Only Part of the Installation

The charging unit is the most visible part of the installation. Yet there is a lot more that goes on behind it.
Commercial fleet charging requires suitable electrical infrastructure. It requires appropriate protection, correct cabling, planning, and thorough testing and commissioning. And of course, it needs to work as part of the wider electrical system within the premises.
For that reason, choosing the right installation approach is just as important as choosing the charger itself.

Getting Fleet Charging Right

For businesses transitioning to electric vehicles, reliable infrastructure is essential to keep the fleet moving.
The best installation will not necessarily be the one with the most chargers or the highest charging speeds. It will be the one designed around the vehicles, the working patterns of the business and the electrical infrastructure available on site.
Tagged as: blog, Electric cars
Share this post: